翻訳と辞書 |
Samsun–Çarşamba railway : ウィキペディア英語版 | Samsun–Çarşamba railway
The Samsun–Çarşamba Railway Line (Turkish:''Samsun-Çarşamba Demiyol Hattı'') is a 37 km long narrow gauge railway route from Samsun to Çarşamba. ==History== In 1924 the Nemli Zade family obtained a 75 year concession to build a 750mm gauge railway line from Alacam through Bafra, Samsun, Çarşamba to Terme. The line would be 150 km long. Only the part between Samsun and Çarşamba was ever built. This line opened in 1926. In 1928 the family went through heavy financial problems and the rest of the construction was canceled. TCDD took over the line in 1929. TCDD closed the line in 1971.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Samsun–Çarşamba railway」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|